REACTplus Quality
Control
Our Q-Pulse managed quality
system drives our traceable manufacturing process and ensures
repeatability.
We work as standard to IPC-A-610-D
(Lead-Free) with leaded processing treated as a controlled
exception.
100% Physical/AOI Inspection
There is no compromise position;
all product is 100% inspected. It is the standard:
• Components inspected &
checked off against work instructions prior to start
• First
off ‘Golden Board’ sign-off at every production
operation
• Scanspection’
AOI on SMT boards prior to re-flow
• AOI
final inspection prior to shipment
• Final
visual inspection in packing |